L angle Specified for Inverter cabinet / GPO-3 L angle specified for inveter
Product Description:
GPO-3 L angle is pultruded by composed of e-class glass-fiber and/or glass-mat reinforced unsaturated polyester and inorganic filler binder.
Product Advantages:
Technical advantages, mold development and design capabilities, excellent supporting capacity.
Excellent size, space stability, non cracking, non Explosive Edge
Excellent Arc Resistance(Arc Resistance≥180 S)
Excellent Track Resistance(CTI≥600V)
Excellent Heat Resistance(Class F)
Excellent Thermal Impact(Temp. Index: -273℃ to +155℃)
Excellent Fire Retardant(UL 94 V-0 Grade)
Application:
Red L angle is used extensively in equipmnents of Power controller & Power transmits as cable bridge & angle insulation; insulating channel of Bus duct & fuse;insulating support of Inverter,converter etc.
Diagram:
Specification sheet:
Product Name | Item No. | Size |
GPO-3 L angle | HC-XC-L-W | GPO-3 White L angle 2.5*14*14 |
HC-XC-L-R | GPO-3 Red L angle 3.0*40*40 | |
HC-XC-L-R | GPO-3 Red L angle 4.0*30*40 | |
HC-XC-L-R | GPO-3 Red L angle 4.0*40*88.5 | |
HC-XC-L-R | GPO-3 Red L angle 4.8*31.8*44.45 | |
HC-XC-L-R | GPO-3 Red L angle 5.0*50*50 | |
HC-XC-L-R | GPO-3 Red L angle 6.0*20*34 | |
HC-XC-L-R | GPO-3 Red L angle 6.0*25*50 | |
HC-XC-L-R | GPO-3 Red L angle 6.0*30*50 | |
HC-XC-L-R | GPO-3 Red L angle 6.0*50*50 | |
HC-XC-L-R | GPO-3 Red L angle 6.0*75*100 | |
HC-XC-L-R | GPO-3 Red L angle 6.35*50.8*50.8 | |
HC-XC-L-R | GPO-3 Red L angle 8*50*50 | |
HC-XC-L-R | GPO-3 Red L angle 8.0*50*65 | |
HC-XC-L-R | GPO-3 Red L angle 10*50*75 | |
HC-XC-L-R | GPO-3 Red L angle 10*50*80 | |
HC-XC-L-R | GPO-3 Red L angle 10*50*125 | |
HC-XC-L-R | GPO-3 Red L angle 10*63*100 | |
HC-XC-L-R | GPO-3 Red L angle 10*75*75 | |
HC-XC-L-R | GPO-3 Red L angle 10*80*150 | |
HC-XC-L-R | GPO-3 Red L angle 10*90*90 | |
HC-XC-L-R | GPO-3 Red L angle 10*125*125 | |
HC-XC-L-G | GPO-3 Grey L angle 6*50*50*1350 |
Pultrusion Technique
Custom Your Own Mould | |
Mould trade Process | |
1. Quote | According to the sample & Sample |
2. Comfirm | Color,Material,Price,Payment,MOQ, |
3. Advance | Pay the Mould cost 100% by T/T |
4. Mould Design/Processing | Start to make mold after mould design cofirm,and send try-out report or trial samples to customer for comfirmation |
5. Balance settlement | 100% by T/T after the customer approved the samples and decide to start the production |
6. Delivery | Delivery by sea or air under EXW/FCA |